For the past few months, Mechanic Street and North Limestone have been under seemingly-endless construction as the water lines along our streets have been replaced. Initially only slated for a few weeks, the construction has dragged on – often with no apparent activity for days at a time.
At the same time, we’ve been repainting the outsides of our buildings at Lowell’s. This has included scraping nearly 70 years of paint off of our buildings (and making some interesting discoveries along the way), replacing much of the mortar along some walls, priming, and painting.
So, we’ve got holes, above-ground pipes, and piles of gravel in our street. And our building looks completely different on the outside.
But don’t let the mess put you off – we’re still ready to help with whatever your vehicle needs!
Pingback: north lime – Lowell's